B-1.1, r. 11 - Regulation respecting safety in public baths

Full text
SCHEDULE 2
(s. 16)
_________________________________________________________________________________
| | |
| | Springboard |
| | and platform |
| |_____________________________________________________|
| | | |
| | 1 m | 3 m |
| |__________________________|__________________________|
| | | |
|J/K. Distance and depth | at a distance of 6.00/ | at a distance of 6.00/ |
| ahead of plummet | minimum depth of 3 m | minimum depth of 3.50 m |
| | | |
| | | |
|L/M. Distance and depth | at a distance of 2.50/ | at a distance of 3.25/ |
| each side of plummet | minimum depth of 3 m | minimum depth of 3,50 m |
| | | |
|N. Maximum angle of | 45 degrees* | 45 degrees* |
| slope to reduce pool | | |
| bottom to that of the | | |
| total required depth | | |
|___________________________|__________________________|__________________________|
* On condition that the minimum depth of the water at pool side under the springboard or platform is 1.8 m.
R.R.Q., 1981, c. S-3, r. 3, Sch. 2.